Week One of the 11 pairs in 2011 Challenge

I know I mentioned a few days ago that I was joining the 11 mittens for 2011 challenge on the Ravelry group I Make Mittens. Our start time was midnight GMT on New Years Eve,  which meant that I could start at 7 p.m. my time. I was about to sit down to a lovely prime rib dinner then, so it was closer to 8 p.m. before I actually cast on. We watched a couple of shows on Netflix instant download after supper and I astonished myself by (a) staying up to midnight (it’s been a long time since I bothered to stay up for New Year’s) and (b) finishing the first mitten. I cast on for the second one Saturday morning and finished grafting the thumb tip at about 10 p.m. Myrriah suggested the color combination here. She said it would be a “witchy” look!

Green and Black basic mittens

I’m probably going to make a pair with blue cuffs and black hands next.

Author: Jorah

I grew up in New England, did a short stint in the U.S. Navy after high school, worked in various factories, built & renovated houses, and finally moved to the Carolinas in 1998 to start working at what was then a large regional bank and is now a really big nationwide bank. I work doing SharePoint management site management. After work I make soap, knit, ride my motorcycle, read, watch movies & eat. I ride a Yamaha V-Star 1300. I am pretty sure that I want to hike the Appalachian Trail someday, or possibly do a long-distance rowing trip. I'll be retiring in a few years, and hope to run a craft soap-making business to bring in some cash.

One thought on “Week One of the 11 pairs in 2011 Challenge”

  1. I love the ornament cozy and all the mittens! Jorah, great to finally meet you in SF. Hope you enjoyed your visit and drive up the coast.

Comments are closed.

Discover more from Jorah's 80% Fat-Free Blog

Subscribe now to keep reading and get access to the full archive.

Continue reading