Week One of the 11 pairs in 2011 Challenge

I know I mentioned a few days ago that I was joining the 11 mittens for 2011 challenge on the Ravelry group I Make Mittens. Our start time was midnight GMT on New Years Eve,  which meant that I could start at 7 p.m. my time. I was about to sit down to a lovely prime rib dinner then, so it was closer to 8 p.m. before I actually cast on. We watched a couple of shows on Netflix instant download after supper and I astonished myself by (a) staying up to midnight (it’s been a long time since I bothered to stay up for New Year’s) and (b) finishing the first mitten. I cast on for the second one Saturday morning and finished grafting the thumb tip at about 10 p.m. Myrriah suggested the color combination here. She said it would be a “witchy” look!

Green and Black basic mittens

I’m probably going to make a pair with blue cuffs and black hands next.

Author: Jorah

I grew up in New England, did a short stint in the U.S. Navy after high school, worked in various factories, built & renovated houses, and finally moved to the Carolinas in 1998 to start working at what was then a large regional bank and is now a really big nationwide bank. I work doing SharePoint management site management. After work I make soap, knit, ride my motorcycle, read, watch movies & eat. I ride a Yamaha V-Star 1300. I am pretty sure that I want to hike the Appalachian Trail someday, or possibly do a long-distance rowing trip. I'll be retiring in a few years, and hope to run a craft soap-making business to bring in some cash.

One thought on “Week One of the 11 pairs in 2011 Challenge”

  1. I love the ornament cozy and all the mittens! Jorah, great to finally meet you in SF. Hope you enjoyed your visit and drive up the coast.

Comments are closed.